Required for 265V unit.
The fully skirted sub-base conceals wiring and provides strong support. Plug-in receptacle and field-wiring access speed installation.
Electrical accessories meet NEC requirements; can be installed in the unit sub-base.
Sub-base may be installed onto wall sleeve either before or after sleeve installation.
Minimum clearance between wall sleevebottom and finished floor is 3 3/4”; maximum height clearance from bottom of wall sleeve and finished floor is 5”.
Minimum clearance between wall sleeve flange and finished wall is 2 3/4”.
Required for 265V unit.
The fully skirted sub-base conceals wiring and provides strong support. Plug-in receptacle and field-wiring access speed installation.
Electrical accessories meet NEC requirements; can be installed in the unit sub-base.
Sub-base may be installed onto wall sleeve either before or after sleeve installation.
Minimum clearance between wall sleevebottom and finished floor is 3 3/4”; maximum height clearance from bottom of wall sleeve and finished floor is 5”.
Minimum clearance between wall sleeve flange and finished wall is 2 3/4”.
Copyright © 2005 -2022
Add a review
Your email address will not be published. Required fields are marked